Heping District, Shenyang, Liaoning · 6.9 mu · 0.46 ha
沈阳市医大附属口腔医院盘活利用
Three vacant office buildings on allocated land in central Shenyang were rezoned for healthcare and sold on the secondary land market — Liaoning's first online public listing with timed bidding for allocated land — to a neighbouring dental hospital, which converted them into a second campus without demolition.
Floor space brought back into use
0 → 19,078 m²
Jiao District, Jiamusi, Heilongjiang · 13.4 mu · 0.9 ha
佳木斯市纺织厂家属楼保护利用
Four 1952 Soviet-style workers' housing blocks, listed as historic buildings but rated structurally unsafe, were bought out from 217 households and converted into 189 affordable rental homes. The case presents this as China's first conversion of a listed historic building into affordable rental housing, with rents funding upkeep.
Tinghu District, Yancheng, Jiangsu · 21.6 mu · 1.44 ha
盐城市 8 号新生·数字科技创新园功能重塑
The vacant old campus of Yancheng No. 8 Middle School was rezoned from education to business office use and sold by public listing — with its buildings and a design scheme attached — to the district's urban investment company. A specialist operator turned classrooms into offices and labs and dormitories into talent apartments; 35 digital-technology firms now occupy 95% of the space.
Occupancy
0% → 95%
Laishan District, Yantai, Shandong · 47.4 mu · 3.16 ha
烟台市山东港口国际交流中心迭代更新
A disused 1980s seafront hotel owned by Yantai Port Group was demolished and rebuilt by the owner itself as an international conference and training centre. Without changing the land use or site area, the floor area ratio rose from 0.27 to 0.75 and about 9,400 m² of basement space was added.
Floor area ratio
0.27 → 0.75
Xialu District, Huangshi, Hubei · 10 mu · 0.67 ha
黄石市“工友茶馆+幸福食堂”功能提升
An empty steelworks-company warehouse beside an old workers' housing estate was turned into a retro teahouse and subsidized community canteen for older residents. Using a five-year transition policy that keeps the original owner and land use unchanged, the subdistrict office avoided any transfer of title and paid for the hard renovation, while an operator fitted it out and runs it.