Liangxi District, Wuxi, Jiangsu · 3,735 mu · 249 ha
无锡市扬名空天产业园产业升级
A 3,735-mu traditional industrial cluster in central Wuxi was consolidated by the district government and rebuilt by a state-owned platform as an "industrial community" for commercial aerospace. Multi-storey "skyscraper factories" raised the park-wide floor area ratio from under 0.8 to over 2.5, while tax revenue per mu tripled.
Park-wide floor area ratio
below 0.8 → above 2.5
Paojiang, Shaoxing Binhai New Area, Shaoxing, Zhejiang · 6,988 mu · 465.9 ha
绍兴市“绍芯谷”城市更新
Shaoxing relocated dozens of dyeing and chemical plants across county boundaries to dedicated industrial zones, then redeveloped the vacated 6,988-mu Mahai area as "Shaoxin Valley" for semiconductor-related industries. A menu of "four categories, ten methods" let each landowner choose self-redevelopment, joint development, buy-out or exit instead of blanket government acquisition.
Average floor area ratio after self-redevelopment
below 1.0 → above 2.0
Gongshu District, Hangzhou, Zhejiang · 547 mu · 36.5 ha
杭州市杭钢半山基地转型发展
After its steel lines closed in 2016, Hangzhou Iron & Steel Group redeveloped 547 mu of its retained land into a computing and data-centre cluster. Fragmented allocated and leased parcels were re-plotted and transferred back to the group by agreement under new planning conditions, ending what the case calls an "institutional freeze" on the land.
Floor area ratio, IT innovation centre
0.7 → 1.5
Laishan District, Yantai, Shandong · 47.4 mu · 3.16 ha
烟台市山东港口国际交流中心迭代更新
A disused 1980s seafront hotel owned by Yantai Port Group was demolished and rebuilt by the owner itself as an international conference and training centre. Without changing the land use or site area, the floor area ratio rose from 0.27 to 0.75 and about 9,400 m² of basement space was added.
Floor area ratio
0.27 → 0.75
Caofeidian New City, Tangshan, Hebei · 168 mu · 11.2 ha
唐山市青龙湖数据生态中心改造升级
Land next to an oilfield production area, hemmed in by well sites and pipelines and left undeveloped, was taken back into the government reserve and rezoned as new-type industrial land combining research and manufacturing. Multi-storey factories cut the building footprint by about 77% compared with conventional single-storey layouts; more than 40 firms have moved in.
Factory footprint vs. conventional layout
73,736 → 16,936 m²
Jing'an District, Shanghai · 31 mu · 2.07 ha
上海市江场西路申林木业城市更新
Two state-owned groups — the land's owner Bailian and the Shibei industrial-park company — formed a joint venture to redevelop an old timber-yard site. The land was taken into the reserve, rezoned for R&D at a floor area ratio of 3.5 and won back by the joint venture as Jing'an District's first "standard land" sale, with a contractual tax target of CNY 165 million a year.
Floor area ratio
0.32 → 3.5
Nankang District, Ganzhou, Jiangxi · 940 mu · 62.7 ha
赣州市南康区老旧家具产业集聚区集约提质
Three self-built furniture workshop clusters of tin sheds on 5–10-mu plots were re-plotted from 66 scattered holdings into 60 regular parcels. A transparent "land-share ratio" formula gave each firm net land in proportion to what it originally occupied, after deducting roads and fire lanes, so that firms could rebuild multi-storey factories themselves.
Average floor area ratio
0.5 → 2.0
Binhai New Area, Tianjin · 1,545 mu · 103 ha
天津市国际农产品交易中心转型升级
Half-empty warehouse land in Tianjin's port area was rezoned for a wholesale agricultural market. Because national logistics policy lets wholesale-market land be valued at industrial rates, no land premium was payable on the change of use — saving the operator nearly CNY 600 million — and the remaining lease term carried over to 2061.
Floor space
100,000 → 770,000 m²
Shengshan Town, Cixi, Ningbo, Zhejiang · 48.2 mu · 3.21 ha
宁波市胜山创新园区联合改造
Three neighbouring bicycle-parts makers merged six small industrial parcels into one, rebuilt them together as multi-storey factories and shared roads, fire lanes and green space. Lease terms were aligned to a single expiry date, and after completion each building received its own title with shared land apportioned by floor area.
Floor area ratio
0.8 → 2.72
Chidian, Jinjiang, Quanzhou, Fujian · 206 mu · 13.8 ha
泉州市安踏(中国)有限公司并宗开发
Sportswear maker Anta merged five adjacent industrial parcels bought between 2005 and 2024. A Jinjiang rule let the merged site take the longest remaining term (to 2074) rather than the shortest, for a top-up premium of CNY 6.4 million, and planning indicators were balanced across the merged site, raising the floor area ratio from 1.4 to 4.0.
Floor area ratio
1.4 → 4.0
Doilungdêqên District, Lhasa, Tibet · 23.1 mu · 1.54 ha
拉萨市龙腾大厦有机更新
Two run-down plots with incomplete land records — allocated government land and an old start-up centre of unclear title — were merged, rezoned commercial and transferred to a district-owned company together with the buildings on them. A minimum investment of CNY 250 million was written into the land contract; the new mixed office, retail and talent-housing complex opened in 2024.
Floor space
under 15,000 → 52,307 m²
Zhiqian Town, Jintan District, Changzhou, Jiangsu · 500 mu · 33.3 ha
常州市金坛区乡村产业“串珠成链”
A long, narrow crab-farming town with scattered small plots outside the urban development boundary revived about 500 mu of old village-enterprise land through 16 projects. Five industrial nodes along roads and rivers link processing, cold chain and logistics to the crab ponds; some collective land was contributed as equity, giving villages a share of rents.
Investment intensity
1.5 → 3.0 CNY million per mu
Yinan Economic Development Zone, Linyi, Shandong · 199 mu · 13.3 ha
临沂市科鲁特片区腾退整备
A bankrupt steel pipe plant's 199-mu site was frozen by repeated court seizures. A county state-owned company bought the bank debt, had the court auction the land, won it, then subdivided it for four new manufacturers — all in production within 18 months of launch.
Floor area ratio
0.3 → above 1.2
Zhaijia Town, Linyi County, Dezhou, Shandong · 176 mu · 11.7 ha
德州市卓越高新材料产业园拆改结合
A new-materials company bought all the assets of a bankrupt packaging firm by negotiation, then had a court confirm the sale and lift encumbrances so title could be transferred. Existing buildings were assessed one by one — some kept and refitted, most rebuilt — and the project started construction 45 days after obtaining the land.
Floor area ratio
below 0.3 → 1.02