Binhai New Area, Tianjin · 1,545 mu · 103 ha
天津市国际农产品交易中心转型升级
Half-empty warehouse land in Tianjin's port area was rezoned for a wholesale agricultural market. Because national logistics policy lets wholesale-market land be valued at industrial rates, no land premium was payable on the change of use — saving the operator nearly CNY 600 million — and the remaining lease term carried over to 2061.
Floor space
100,000 → 770,000 m²
Kunming Economic and Technological Development Zone, Kunming, Yunnan · 72.5 mu · 4.83 ha
昆明市七彩云南庆沣祥分割转让
A tea company that no longer needed 72.5 mu of its 163.8-mu industrial site had the surplus split off as a separate parcel and sold it on the secondary market to a developer of standard factories. Because the law requires 25% of investment to be completed before land can be transferred, the buyer was allowed to register the transfer in advance and start building, with final title issued once the threshold was met.
Original parcel
163.8 → 91.3 mu
Yinan Economic Development Zone, Linyi, Shandong · 199 mu · 13.3 ha
临沂市科鲁特片区腾退整备
A bankrupt steel pipe plant's 199-mu site was frozen by repeated court seizures. A county state-owned company bought the bank debt, had the court auction the land, won it, then subdivided it for four new manufacturers — all in production within 18 months of launch.
Floor area ratio
0.3 → above 1.2
Zhaijia Town, Linyi County, Dezhou, Shandong · 176 mu · 11.7 ha
德州市卓越高新材料产业园拆改结合
A new-materials company bought all the assets of a bankrupt packaging firm by negotiation, then had a court confirm the sale and lift encumbrances so title could be transferred. Existing buildings were assessed one by one — some kept and refitted, most rebuilt — and the project started construction 45 days after obtaining the land.
Floor area ratio
below 0.3 → 1.02
Xiangtan Economic Development Zone, Xiangtan, Hunan · 1,510 mu · 100.7 ha
湘潭市泰富重工整备焕新
A 1,510-mu heavy-machinery plant left empty by bankruptcy was taken over through court-supervised restructuring by Zoomlion, a firm whose products could use the existing sheds. Missing drawings and approvals were retro-fitted, and indicators were balanced across the area so a noisy test track could be moved away from homes — saving 300 mu of new land.