Idle Commercial & Public Buildings
Vacant offices, hotels, schools, supermarkets and similar buildings brought back into use.
7 cases
Heping District, Shenyang, Liaoning · 6.9 mu · 0.46 ha
沈阳市医大附属口腔医院盘活利用
Three vacant office buildings on allocated land in central Shenyang were rezoned for healthcare and sold on the secondary land market — Liaoning's first online public listing with timed bidding for allocated land — to a neighbouring dental hospital, which converted them into a second campus without demolition.
Floor space brought back into use
0 → 19,078 m²
Tinghu District, Yancheng, Jiangsu · 21.6 mu · 1.44 ha
盐城市 8 号新生·数字科技创新园功能重塑
The vacant old campus of Yancheng No. 8 Middle School was rezoned from education to business office use and sold by public listing — with its buildings and a design scheme attached — to the district's urban investment company. A specialist operator turned classrooms into offices and labs and dormitories into talent apartments; 35 digital-technology firms now occupy 95% of the space.
Occupancy
0% → 95%
Laishan District, Yantai, Shandong · 47.4 mu · 3.16 ha
烟台市山东港口国际交流中心迭代更新
A disused 1980s seafront hotel owned by Yantai Port Group was demolished and rebuilt by the owner itself as an international conference and training centre. Without changing the land use or site area, the floor area ratio rose from 0.27 to 0.75 and about 9,400 m² of basement space was added.
Floor area ratio
0.27 → 0.75
Guancheng Hui District, Zhengzhou, Henan · 46 mu · 3.07 ha
郑州市亳都新象历史文化街区活化利用
A vacant former college campus inside the protected core of the Shang dynasty capital site was acquired, rezoned for mixed commercial and cultural use, and sold with heritage obligations — height limits, street pattern and a performance bond — written into the land contract. The courtyard-style district opened in 2025 and drew over 500,000 visitors in its first holiday week.
Qinhuai District, Nanjing, Jiangsu · 19.5 mu · 1.3 ha
南京市金陵长乐坊城市更新
A former knitwear factory turned Walmart, vacant since 2020 and next to the Confucius Temple area, had mixed allocated and sold land and 29,000 m² of unpermitted buildings. After penalties were imposed, the buildings were regularized, the owner paid CNY 233 million to convert allocated industrial land to commercial use, and the complex reopened as a culture-and-retail destination.
Floor space brought back into use
0 → about 40,000 m²
Doilungdêqên District, Lhasa, Tibet · 23.1 mu · 1.54 ha
拉萨市龙腾大厦有机更新
Two run-down plots with incomplete land records — allocated government land and an old start-up centre of unclear title — were merged, rezoned commercial and transferred to a district-owned company together with the buildings on them. A minimum investment of CNY 250 million was written into the land contract; the new mixed office, retail and talent-housing complex opened in 2024.
Floor space
under 15,000 → 52,307 m²
Malanshan Video Cultural and Creative Industrial Park, Changsha, Hunan · 123 mu · 8.2 ha
长沙市湖南广电“七彩盒子”整合盘活
One TV production campus sat on three plots — allocated land held by the broadcaster and sold land split between the broadcaster and its media group — so it could not be planned, permitted or mortgaged as one. The allocated land was injected into the group as a capital contribution instead of paying a CNY 123 million land premium, and the other plot's owner name was simply changed, unifying all 123 mu under one company.