Liangxi District, Wuxi, Jiangsu · 3,735 mu · 249 ha
无锡市扬名空天产业园产业升级
A 3,735-mu traditional industrial cluster in central Wuxi was consolidated by the district government and rebuilt by a state-owned platform as an "industrial community" for commercial aerospace. Multi-storey "skyscraper factories" raised the park-wide floor area ratio from under 0.8 to over 2.5, while tax revenue per mu tripled.
Park-wide floor area ratio
below 0.8 → above 2.5
Paojiang, Shaoxing Binhai New Area, Shaoxing, Zhejiang · 6,988 mu · 465.9 ha
绍兴市“绍芯谷”城市更新
Shaoxing relocated dozens of dyeing and chemical plants across county boundaries to dedicated industrial zones, then redeveloped the vacated 6,988-mu Mahai area as "Shaoxin Valley" for semiconductor-related industries. A menu of "four categories, ten methods" let each landowner choose self-redevelopment, joint development, buy-out or exit instead of blanket government acquisition.
Average floor area ratio after self-redevelopment
below 1.0 → above 2.0
Gongshu District, Hangzhou, Zhejiang · 547 mu · 36.5 ha
杭州市杭钢半山基地转型发展
After its steel lines closed in 2016, Hangzhou Iron & Steel Group redeveloped 547 mu of its retained land into a computing and data-centre cluster. Fragmented allocated and leased parcels were re-plotted and transferred back to the group by agreement under new planning conditions, ending what the case calls an "institutional freeze" on the land.
Floor area ratio, IT innovation centre
0.7 → 1.5
Jin'an District, Fuzhou, Fujian · 5,325 mu · 355 ha
福州市福兴经济开发区提质增效
A 30-year-old development zone in central Fuzhou, 80% built out, revitalized 1,100 mu of inefficient land without new construction-land quotas. Tools included a parcel-by-parcel data base, property-for-property swaps for expropriated warehouse owners, tiered 20–50-year industrial land leases and a much faster approval process.
Industrial output per mu
3.67 → 4.73 CNY million
Weiyang District, Xi'an, Shaanxi · 19,605 mu · 1,307 ha
西安市未央区团结片区城市更新
A 13-square-kilometre area of northern Xi'an with fragmented tenure — approved-but-unsupplied land, land awaiting recovery and urban-village plots — was renewed under a city-funded, district-implemented joint land reserve. A railway park was opened up to surrounding streets, and TOD development was planned around metro stations.